1. Profile survey
2. Finalization of Tower location/soil classification/ Soil resistivity
3. Approval of profile survey from utility & Check Survey
4. Ordering of tower materials, conductor & Insulator materials, etc
5. Casting of Foundation Tower erection /insulator hoisting & Stinging
6. Testing of EHV line & Commissioning